This was a design build project. We teamed up with WSP USA as our design firm. Covered approx. 35 miles of the Natchez Trace from MP 296 - MP 331 in Alabama and Mississippi. Work included design, full depth reclamation with cement stabilization, paving, bridge repairs, minor concrete work, drainage repairs and improvments, pavement markings, and signage.